Also here you can see that I have removed all the damaged studs and am re-framing the sections. The door and windows are framed in. I have sheathing installed on the inside of the framing to provide stabilization and security, After all the framing repairs are completed on the exterior shell than I will get an OK from the city inspector and inst
Monday, March 8, 2010
The rot and bug damage
I thought that you might be interested in seeing the damage located on the lower 12" or so of the studs that wer
e next to the ground. (There is a reason why codes require 6" min seperation from the dirt to wood).
Also here you can see that I have removed all the damaged studs and am re-framing the sections. The door and windows are framed in. I have sheathing installed on the inside of the framing to provide stabilization and security, After all the framing repairs are completed on the exterior shell than I will get an OK from the city inspector and inst
all new sheathing and siding. These repairs include obviously the rot and insect damage, also re-framing windows for egress compliance in the bedrooms, and replacing a few stud that have splits, warping, or charring from the fire damage.
Also here you can see that I have removed all the damaged studs and am re-framing the sections. The door and windows are framed in. I have sheathing installed on the inside of the framing to provide stabilization and security, After all the framing repairs are completed on the exterior shell than I will get an OK from the city inspector and inst
Sunday, February 21, 2010
Adjustments toward level
It becomes a important to describe some construction methods of the late 1800 period. Conventional framing today would construct a house by building a platform for the floor, followed by supporting walls, followed by r
oof trusses or another platform for second floor. This system is usually called conventional or platform framing. The main advantages in conventional framing is that the length of the pieces can be shorter and that the floor platform distributes the forces more uniformly.
However, there was a time when trees were plenty, tall and straight. In these days a 24 foot 2x12 was not in scarce supply. In those days it was common to build a house either with large timber beams, or the other method of the time was called balloon framing. In this method the exterior wall is built directly on the foundation and the floors were attached to the wall members. The primary disadvantage in this system is that the wall pieces were long (thus added cost as time progressed) and also that the vertical stud could be under significant loading (because they carry point loads instead of distributed loads).
Our house was built in the 1890s and is a very good example of balloon framing. However, it has for many years
sat with the front wall being in direct contact of the dirt and grass. This I am sure would have resulted in extensive termite damage except that there was plenty of other dead wood in the yard. However, the damp rot mad a good spot for borers and other opportunistic bugs to chew or dig away the structure. When we raised the house, removed the lathe/plaster and removed the lower section of the siding it was clear that while the damage was substantive, it did not go beyond the damp rot area. For this reason it was important to remove the damaged section and repair/replace. This is why the balloon framing has a downside, as significant damage to a section of studs could cause the wall or house to collapse.
I decided very quickly that it would be cheaper and safer to replace the wall than to repair it. The entire side of the house was sagging perhaps 2+ inches. First we installed a few beams across the joists of the second floor and carefully jacked them to remove the loading on the studs. At this point is was critical to establish a planar point of reference in order to find dimensions of the replacement wall. This was not all too difficult as we have replaced the foundation and the sill is level around the perimeter. The side was again raised sufficiently to something around level. At this point I discovered that the wall was not vertical but a parallelogram. It was off by about 3 inches fro
m vertical on only the wall we are replacing. This of course can be corrected by using a hoist or simile pulling device to pull the opposing corners back to straight. What you see here is the replacement wall built and in place with the internal sheathing acting as bracing for the wall. It is not quite finished, but it gives a good idea about both the process and the result. After finishing up the replacement wall in the next week or so, the next project will be to complete any other planar adjustments to ensure that each floor, the exterior and of course the members are as level as can be reasonably accomplished given the limitations of the existing materials.
oof trusses or another platform for second floor. This system is usually called conventional or platform framing. The main advantages in conventional framing is that the length of the pieces can be shorter and that the floor platform distributes the forces more uniformly.However, there was a time when trees were plenty, tall and straight. In these days a 24 foot 2x12 was not in scarce supply. In those days it was common to build a house either with large timber beams, or the other method of the time was called balloon framing. In this method the exterior wall is built directly on the foundation and the floors were attached to the wall members. The primary disadvantage in this system is that the wall pieces were long (thus added cost as time progressed) and also that the vertical stud could be under significant loading (because they carry point loads instead of distributed loads).
Our house was built in the 1890s and is a very good example of balloon framing. However, it has for many years
sat with the front wall being in direct contact of the dirt and grass. This I am sure would have resulted in extensive termite damage except that there was plenty of other dead wood in the yard. However, the damp rot mad a good spot for borers and other opportunistic bugs to chew or dig away the structure. When we raised the house, removed the lathe/plaster and removed the lower section of the siding it was clear that while the damage was substantive, it did not go beyond the damp rot area. For this reason it was important to remove the damaged section and repair/replace. This is why the balloon framing has a downside, as significant damage to a section of studs could cause the wall or house to collapse.I decided very quickly that it would be cheaper and safer to replace the wall than to repair it. The entire side of the house was sagging perhaps 2+ inches. First we installed a few beams across the joists of the second floor and carefully jacked them to remove the loading on the studs. At this point is was critical to establish a planar point of reference in order to find dimensions of the replacement wall. This was not all too difficult as we have replaced the foundation and the sill is level around the perimeter. The side was again raised sufficiently to something around level. At this point I discovered that the wall was not vertical but a parallelogram. It was off by about 3 inches fro
Wednesday, February 17, 2010
Fire in the 1940s
Thursday, January 14, 2010
Twas the night before Christmas
Twas the night before Christmas and all through the house.
Not a creature was stirring,
not even a hammer...
Yup, that's about the state of things right now. Checking under all the mattresses to find spare coins to finance the effort, but you can only look so many times. Also its plenty cold enough to find a way to believe that a persons effort could be better used elsewhere.
Not a creature was stirring,
not even a hammer...
Yup, that's about the state of things right now. Checking under all the mattresses to find spare coins to finance the effort, but you can only look so many times. Also its plenty cold enough to find a way to believe that a persons effort could be better used elsewhere.
Monday, December 21, 2009
Here comes the snowman
Wednesday, November 18, 2009
A long time coming
It was not my fault that I did not post, the dog ate my email. That said its hard to tell a substantive difference in where things are at in the restoration process. There are two reasons for this, time and of course money. Neither seem to be in abundance.
We are currently shoving dirt from one spot to another under the pretense of calling it back fill. Most of the time people will wait until the floor and main flooring is installed before doing the backfill to avoid any buckling of the walls during backfill. Since this project is now a one man show than it was important to get the dirt work done for drainage purposes.

I am hoping to wrap up the dirt moving portion of this project in the near future as there are a few other things on my to-do list before winter. I would stick up some more information or pictures about dirt work, but there is not much to it. You look at your pile of dirt and see if there is any where you can stick it while still having the yard look decent and have good drainage.
The little skid loader has been nothing if not consistent. Consistently down for maintenance. This turn of events is not unexpected as it is an older model which was not well maintained, hence the word cheap, yet it is frustrating to have spent the large amount of time and money to get it up to good working order. I should be able to get the money back out when I sell it.
Next in line is the basement plumbing and cement floor. Since we are basically broke in an effort to save money I will be trying my hand at cement staining for the basement floor. I am looking forward to this part as I have seen some exiting and inexpensive ideas out there. It will likely be several weeks before I rustle up the money for that project. Keep us in prayer on that one.
We are currently shoving dirt from one spot to another under the pretense of calling it back fill. Most of the time people will wait until the floor and main flooring is installed before doing the backfill to avoid any buckling of the walls during backfill. Since this project is now a one man show than it was important to get the dirt work done for drainage purposes.
I am hoping to wrap up the dirt moving portion of this project in the near future as there are a few other things on my to-do list before winter. I would stick up some more information or pictures about dirt work, but there is not much to it. You look at your pile of dirt and see if there is any where you can stick it while still having the yard look decent and have good drainage.
The little skid loader has been nothing if not consistent. Consistently down for maintenance. This turn of events is not unexpected as it is an older model which was not well maintained, hence the word cheap, yet it is frustrating to have spent the large amount of time and money to get it up to good working order. I should be able to get the money back out when I sell it.
Next in line is the basement plumbing and cement floor. Since we are basically broke in an effort to save money I will be trying my hand at cement staining for the basement floor. I am looking forward to this part as I have seen some exiting and inexpensive ideas out there. It will likely be several weeks before I rustle up the money for that project. Keep us in prayer on that one.
Tuesday, September 29, 2009